How long does it take to rig or derig?
1/2 hour for one person. Less than 20 minutes for two. It has been made ready for the water in 10 minutes by two experts! Obviously it will take you longer the first time but you quickly get the hang of it. If you are going to leave the mast up and put the boat in a boat park then removal of the floats and trampolines only takes a total of ten minutes. Realistically from the water to trail-ready only takes 1/2 hour and vice-versa.