How long does it take to remove a popcorn ceiling?
This varies with the layout of the house but, in general, a 500 square foot area would take about a day and a half. A 2,000 square foot area could take as long as four days. Almost all asbestos abatement projects require that the contractor obtain permits. Once the permits are received there is a mandatory ten day waiting period before the contractor can begin the abatement process. The contractor can obtain the permits online and it takes only a few minutes.