How long does it take to put the Dandee 8M Catamaran together?
This depends on the experience of the assembly crew, the equipment available and the preparation. With a crew of four and access to a small crane or forklift you should allow 6 to 8 hours to assemble the main structural components. Allow another four hours or so for raising the mast, attaching the trampoline and deck hardware and bending on the sails. The boat can usually be assembled and launched in less than one day. We provide detailed assembly instructions and we are always just a phone call or email away for extra assistance.