How long does it take to produce a Haynes manual?
From the time a vehicle arrives in our workshop to the time the manual is available is about 5 months. Writing a manual takes a team of technical authors roughly 3 months working with our Haynes mechanic during the vehicle teardown and rebuild, followed by production and printing prior to distribution to retail locations.