How long does it take to prepare project specifications?
It depends on the level of services required and the complexity of the project. Preparation of a complete project manual including front-end documents (bidding and contracting requirements), Division 1 General Requirements, and coordination of consultant specifications will take more time than just the preparation of specific technical sections. A project that is complex or unique in either materials, design, or both, will require more time than a project utilizing typical construction materials, products and methods.