How long does it take to install a Rosco SubFloor?
It generally takes 20 to 30 minutes per panel to install the first time. If you are installing a touring floor that has been previously assembled, an experienced crew of four can install 60-100 panels per hour. The first time you install the floor, attaching the foam pads will be one of the most time consuming tasks. When using customizing panels that must be cut or when dealing with other obstacles or irregularities, installation will take longer.