How long does it take to install a countertop?
Shirestone™countertops are usually completed within a 5-7 day period. There is no lengthy curing time for the tops and items can be safely placed on the countertop within 24 to 48 hours after the top is sealed (depending upon site conditions such as humidity levels and other drying factors). However, the sealer used does not reach peak durability until cured for approximately 4 days, so our recommendation is to wait 4 days before setting items on the countertop. What colors are available? Each Shirestone™ countertop is a custom project. The color selection is based on the customer’s preference. With the stone textured appearance of the tops, the more muted earth tones are the most popular choice. The finished look is also affected by your preference for either a satin or a high-gloss appearance or somewhere in between. Different sealers or a combination is used to provide the desired finish. Does Shirestone™ crack of chip and is it repairable? Shirestone™ countertops are extremely dura