How long does it take to complete a poll or telephone survey?
HRC has had clients call in the morning, commission a poll we conduct that same evening, and produce results the next morning. But that is the exception. Most good projects require two weeks to complete. Typically, questionnaire design takes 3 or 4 days and the interviewing portion of a project requires 2 to 4 days. Topline results are always available to HRC clients within 24 hours after interviewing is completed. Full analysis comes in 5 business days.