HOW LONG DOES IT TAKE TO BUILD A GARNETT HERITAGE SERIES HOUSE IN FACTORY?
The production time in factory depends on a number of variables: complexity of house design, customization of line item specifications, production lead time, and size of project. All things being equal, a 3,000 sq. ft. house should go through factory in four to six weeks. Before the house goes into production, all exterior and interior finishes must be selected.