How long does it take from the start of design until delivery of my timber frame package?
This process can take as little as three months or as long as nine months depending on the complexity of design and the number of changes required to refine it. When the design is complete, it generally takes eight weeks to cut and deliver your frame package. However, if time is critical, it is sometimes possible to improve on the delivery time of the package.