How long does it take for work to begin on a project once the contract is signed?
As a company goal, once a project is put into production (i.e., contract signed), we endeavor to start the on-site remediation work within two weeks. Mobilization is contingent upon obtaining necessary permitting as well as structural drawings to complete the repair. Before the on-site work begins, the project manager will order proper materials, prepare the job site, obtain the required permits, and mark the underground utilities.