How long does it take for OSMO Polyx-Oil to dry?
Ideal conditions for drying finishes include a constant supply of fresh air, temperatures around 70° F, and relatively low humidity. Given adequate conditions, a floor finished with Polyx-Oil is safe to re-coat 24 hours after the first coat, and is safe to open to regular traffic 24 to 48 hours after the second coat. The full curing time for this finish, however, is 2 to 3 weeks. During this time period the floor can be exposed to regular traffic, but all areas of the floor must have constant access to fresh air. We recommend leaving-up all rugs or low-lying furniture that may impede airflow across the surface of the floor.