How long does a kitchen remodeling project typically take from start to finish?
A. This question is difficult to answer because the time needed for a kitchen remodel really depends on the scope of the project. For example, if you are removing a wall to open up the kitchen, which is very common, the project will obviously take longer than if you were to just remove the existing cabinetry and rework a new floor plan based on the current measurements. Here is a good gauge of what your kitchen remodel timeline might look like: 1. Meeting with a professional kitchen designer to get a rendering of your new kitchen, pricing and to sign off on the order 2 to 4 Weeks. 2. Meet with a contractor to go over the scope of your project and to get proposal 1 to 2 Weeks. 3. Selecting all the materials needed for the project 1 to 4 Weeks. 4. Removal and disposal of the existing cabinetry, flooring, appliances etc. 1 to 2 Weeks. 5. Installation of new cabinets, appliances, flooring, plumbing, electrical work etc. 3 to 4 weeks. 6. Clean up and touch ups 1 to 2 weeks.