How long does a floor restoring job take?
If floors do not need any repairs, they can usually be refinished in 3 to 4 days depending on the size of the job. The first day is the most intense, this is when the floor is sanded, stained if requested and one coat of finish is applied. The next two days the floor is screened and another coat applied. The floor can be gently walked on one day after the last coat.