How long do installations normally take?
We strive to complete most typical residential applications such as driveways, walkways, and patios in one or two days. Pools, retaining walls and other larger jobs can vary. Many factors can affect job timeliness including weather, material availability, job access and conditions. How long after installation can I use my patio or driveway? Immediately after all of the installation steps are completed, including compaction and the sweeping in of jointing sand.