Balterio laminate floors cannot be installed on fresh concrete. First consider a drying period depending on the thickness of the concrete. As a general rule we recommend as dry period: 1 week per cm for fresh concrete not thicker than 4cm 2 weeks per cm for fresh concrete thicker than 4cm For details : see our fitting instructions.