How long do I have to submit any drawings required on the Notice of Allowability (PTOL-37)?
Related Questions
- Are the time periods to submit corrected drawings in response to the Notice to File Missing Parts and the Notice to File Corrected Application Papers extendable?
- How long do I have to submit any drawings required on the "Notice of Allowability" (form PTOL-37)?
- How long do I have to submit any drawings required on the Notice of Allowability (PTOL-37)?