How long did it take to build a covered bridge?
It took anywhere from 6 months to a year to build a covered bridge. This was because most of the materials had to be brought to the site by horses. The arches were bent using steam which also took considerable time. The sandstone foundations were extracted from local quarries and brought it with horses as well.