How long can IntegraBase modified asphalt be exposed to traffic before being surfaced?
It can be left unsealed 30-60 days without a cover, sometimes longer depending on the temperatures. The hotter the temps, the quicker you will want to place a wearing course. It is imperative that it is covered though, as sometimes seals or wearing course are not placed due to budgetary cuts or simply forgetting to do so.