How long are the cycle times?
The Standard Cycle will run approximately 47 minutes and the Flex Cycle will run approximately 42 minutes. Variation of a few minutes around this time can be expected depending on the type of load being processed. Wet loads may result in extended and possibly cancelled cycles. Loads must be thoroughly dried to assure rapid instrument turnaround.