How long after an installation should a floor be protected from rolling loads?
Newly installed commercial flooring should not be exposed to routine rolling load traffic (carts, lifters, etc.) for at least 72 hours after installation to allow setting and drying of adhesives. If rolling loads cannot be avoided, protect the installation for 72 hours after installation by covering with wood panels.