How load building with time can be accounted in design of the plant and investments?
A. Our experience is captured in the work on Hosahalli (1988 to 2001). Whatever additional aspect I write on this subject is simply theory. It is important to account for load build up sooner than later. Minimum most investment is obtained when all of it is planned in one go. More things can be stated only when you give the scenarios of the power utilization possibilities or the environment.