How large is new pier?
The initial concept for the shoreline improvements called for a pier of nearly identical size of the existing pier. The College is working with engineers to determine if the new pier and wave screen can be reduced in size while still providing the benefits for protecting the shoreline. A revised concept will be presented at the next public meeting of the College and City Capital Design Advisory (CDA) scheduled for November 13th.