Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How is the tunnel likely to be built?

built likely tunnel
0
Posted

How is the tunnel likely to be built?

0

Three main techniques will likely be used for tunnel and station construction, depending on geological conditions and facilities needed at street level such as station entrances and vent shafts. The construction methods are tunnel boring, cut-and-cover and mining. Tunnel Boring: It is anticipated that much of the downtown tunnel will be built using tunnel boring technology in which a circular cutting machine drills a tunnel in rock or soil with minimal disruption to the street. The excavated material is then taken to the launch site at the west end of the tunnel where it will be removed by truck. Cut-and-Cover: With cut-and-cover construction, a trench is cut in the street, the soil is supported by vertical walls and a frame is built to support steel beams and wooden decking to cover over the cut. The decking allows the street to remain open to traffic and pedestrians while excavation and construction continue below. Cut-and-cover may be used at certain station locations and for sectio

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123