How is the slump affected?
Slump loss is minimized. Since the cement is already wet it has less to absorb during transit. The driver typically does not need to wait long after loading to know what his slump is. The load will not “tighten up” as with a usual dry batch load. However, this does not mean that it will “go off” earlier or later.