How is the Airdrie-Bathgate Rail Link affected by other transport schemes in the pipeline?
The project has been developed on a stand-alone basis and apart from the planned electrification of the Mound tunnel and four platforms at Edinburgh Waverley station, which are being delivered as part of the Edinburgh Waverley Infrastructure Works project (http://www.networkrail.co.uk/aspx/3452.aspx) is not dependent on other schemes being delivered.