How is Infraserv going to make sure that the plant only incinerates the designated types of waste?
14 certified suppliers have signed long-term contracts to supply the plant with prepared, quality-controlled refuse-derived fuel. The fuel will only be used if it has been sorted and processed by the suppliers in accordance with detailed quality specifications. Regular testing will ensure the fuel is compliant. The fuel will also be examined in a quality control inspection at the power plant. The waste producers and the WTE power plant will closely coordinate and interlink their quality-management systems to ensure the RDF consistently meets specified quality standards. This commitment clearly differentiates the WTE power plant from conventional waste-incineration plants.