How is cork installed?
Cork is installed onto a smooth level sub-floor using a water based, zero VOC adhesive. This is an easy to use, one application, trowel on adhesive. (After the tiles are laid, they must be rolled with a 100 lb., 12 inch wide roller.) The cork floor will be ready for regular use 72 hours after installation.