How is BUR applied for maximum performance?
It’s critical to get secure bonding of the roofing felts (plies) using bitumen. To achieve this bond the roofing contractor applies thin, uniform moppings of bitumen. This waterproofs the system and ensures proper adhesion for fusing the membrane system together. The temperature of the bitumen is critical. By heating it to the proper temperature the roofing contractor gets the right viscosity for proper mopping. The contractor heats the bitumen to its EVT or Equiviscous Temperature, the temperature at which it can be most effectively mopped into uniform layers. Each batch of bitumen should be labeled by the supplier with its EVT. Once felts are rolled into place on the heated bitumen applicators pull brooms or squeegees over the felt or use some other method to make sure that its embedded in the bitumen. The strength of the membrane depends on the type of felt used, the number of plies, overall ply construction, and the lapping of the overlaying felts. Typically, membrane ply construct