How frequently is the information disseminated by the Qubec 511 updated?
The information concerning major events in progress on the road network resulting in significant obstacles is updated as soon as the MTQ is informed of a change in the condition of the road or when the event evolves or ends. The information on winter road conditions is updated at least twice a day (very early in the morning and in the afternoon) or whenever changes occur. Information on road work is updated when a project is completed or as the work evolves. Once the information is captured in the information processing systems, it is made accessible on Qubec 511 within no more than 5 minutes.