How does USG Framing’s performance framing reduce job site waste?
Our solution reduces job site waste, cleanup and disposal costs. Steel panels are manufactured to spec and delivered to your job site intact. There’s no cutting and no scrap material to clean up and get rid of. If stick-building is needed for a change in the field, the waste is minor. With wood typically accounting for 40% to 50% of job site waste (according to NAHB), you can see how using panelized steel can make a big difference in your dumpster costs. Back to the top.