How does the Technology Planning Tool align with the five E-Rate criteria set forth by the SLD?
E-Rate Critical icons are located throughout the TPT. These icons, , specify the sections of the TPT that are essential to addressing the five E-Rate required technology planning elements listed below. Suggestions for addressing E-Rate technology plan requirements are provided where you see the E-Rate Critical icon. E-Rate Critical icons and content are located in the following sections of the TPT: 1.2, 1.4, 2.2-2.8, 4.1, 4.2, 4.4, 4.6 and 5.0.