How does the final cost of Formblock® compare with standard block-work?
A. The system can be layed two to three times faster than conventional mortared block work (subject to training), so just the time saving alone has a flow-on effect. For example, three weeks savings on a job can save three weeks crane hire, three weeks scaffold hire and three weeks in outgoing loan monies… and the list goes on.