How does Public Works determine where snow removal equipment will be utilized?
When approximately 2-3 inches of snow has fallen the remainder of the snow equipment is called out and put into service. The Village does not have enough equipment to make sure every street is kept clear of snow during the duration of the storm though through careful planning and with dedicated staff, snow operations will continue until every street has been cleared. We have 1 sidewalk plow which is used to clear sidewalks around schools and along Deerfield and Waukegan Roads.
When approximately 2-3 inches of snow has fallen the remainder of the snow equipment is called out and put into service. The City does not have enough equipment to make sure every street is kept clear of snow during the duration of the storm though through careful planning and with dedicated staff, snow operations will continue until every street has been cleared.