How does PALCO handle engineering change orders (ECOs)?
When the manufacturer requires the implementation of an ECO, PALCO can step in and assume those upgrade responsibilities completely. If the change requires upgrading products in the field, we can manage the returns process, institute a swap program, or simply provide repaired product with rapid turnaround to minimize customer downtime.