How does Equip calculate the Lead and Lag time for an event?
When you create an Order, or re-calculate the stock allocated to an Order, Equip uses the build and dismantle times specified for each Structure to determine lead and lag times for each order line. The order line with the maximum lead time denotes the lead time for the Order and the order line with the maximum lag time denotes the lag time for the Order. In a similar way, if there is more than one Order associated with an Event, the maximum lead and lag times determine the lead and lag time for the Event.