How does EASI prove its systems are savings money?
Measurement and verification are the most important engineering work we conduct. Our business is based on saving you money. Energy Automation Systems Inc. (EASI) establishs a measurement and verification protocol for your facility. Our methodology is drawn from and complies with the International Performance Measurement and Verification Protocol (IPMVP). The IPMVP was established by a network of energy professional and national organizations from over 25 countries for the purpose of standardizing the methods by which energy conservation projects are measured and verified. EASI moves forward with an installation project when there is a clear understanding and agreement on our measurement and verification.