Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

How does a QuickSilver floor liner install?

floor install liner Quicksilver
0
Posted

How does a QuickSilver floor liner install?

0

QuickSilver has a quick and easy installation system. The QuickSilver floor liner is installed with approximately 14 fasteners at the front of the dump and leading edge protectors installed along both sidewalls. The leading edge protector is a guide for the QuickSilver material, allowing for thermal expansion and contraction. You can install QuickSilver yourself with basic shop tools using our complete Installation Guide or see a nearby QuickSilver distributor. For hot asphalt applications, the installation varies a bit. First of all, you can only use 1/2″ QuickSilver. Further, a hot asphalt hold down plate is recommended as part of the initial installation process. (This hold down plate eliminates the problem of the curling QuickSilver rear end.) Finally, the bolting pattern is different than in non-asphalt applications. Please refer to the installation guide for more details. DURAPRO installs the exact same way as the QuickSilver non-asphalt installation.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123