How do you know that you have filled the entire void after reinsulating with the ConduFill Process?
All dimensions and void sizes are pre-calculated by our engineering team before our mobile pumping unit dispenses the formulation into your piping system. Pressures, temperatures and flow rates are set at the mix head depending on the length and complexity of the shot. A 10-15% volume overage is then factored in to ensure a complete fill within your system. TST has performed several field excavations to verify that the entire void has been filled. In each case, the test has revealed a complete fill (click here for more details about our verification excavation with Con Edison of NY ).