How Do You Install A Bored Water Well?
You bought the land, now all you need is a building and a water supply. Installing a bored private water well system requires several important steps to do carefully and correctly so you don’t waste time and money or damage property. Here are the steps necessary to install a bored water well system on your property. Check local codes and make sure you get all permits and forms your municipality requires. Some municipalities require anywhere from just a permit, which usually comes with a permit fee, to a plan submitted by a licensed well driller which meets all necessary setbacks and material standards. Hire a certified drilling contractor. This ensures you not only have a well drilled properly, but the contractor should also make sure you meet all the requirements of the local township or borough and state regulatory agencies, and the contractor will submit the proper paperwork to these agencies as well. Choose a location. With the help of the drilling and construction contractor, choo