How do I submit new liability costs for WM approvals?
Currently, the WM approval holder must conduct a site-specific liability cost estimate for the costs associated with suspension, abandonment, decontamination and surface land reclamation in accordance with Directive 001. The WM approval holder must then provide the ERCB with a completed Directive 075: Oilfield Waste Liability (OWL) Program Appendix 7 form.