How do I prepare my wall for CurvTambour installation?
Make sure surface to be covered is clean, dry and free of dirt or other foreign matter. Unsealed wall surfaces must be sealed with a good grade of sealer. Check areas to be covered for squareness. If a non-square wall is to be covered, it is best to run a plumb line to establish a true vertical reference point. In areas of high humidity, such as below grade or where moisture is always present, exterior walls should be waterproofed and insulated. Steps should be taken to remove excessive moisture with dehumidifying equipment. In new construction, you should wait until the walls have completely dried or cured before proceeding with the installation. It is the responsibility of the installer, facility manager, property owner, to properly prepare the wall, and maintain approved normal air-flow conditions.