How do I know how much it will cost for a Technical Assistance (TA) provider to perform an energy analysis of my project?
Technical Assistance (TA) costs vary from project to project. The fee for the technical analysis is based on the methods of analysis being used as well as how many measures are being analyzed. If an Applicant is interested in obtaining a Technical Assistance provider, NYSERDA will conduct a scoping meeting at the onset of the process to determine an applicant’s desired scope of work of the Technical Assistance and the cost of proposed work for an Applicant’s review and approval, prior to proceeding with the assistance..
Related Questions
- How do I know how much it will cost for a Technical Assistance (TA) provider to perform an energy analysis of my project?
- Should all the Java files or classes in my application be added to JCover project to perform coverage analysis?
- Is equipment for the Career & Technical Center included in the $39.5 million maximum project cost?