How do I initialize the sample applications (e.g. SPP Client)?
A12. ActiveSync all the files present in the SDK Root\bin directory to the terminal application directory. 1. Launch the StackSPP application. 2. Select the correct transport from the Setup Menu (i.e. Baud Rate 57600, Port: BTS6, Protocol: UART) 3. Tap on Setup à Port à BT6. 4. If the initialization is correct, then “Stack Initialization on BTS6 115200 (UART) successful” message will be displayed. 5. Tap on Devices à StartInquiry to discover the remote devices. 6. Select remote device BD_ADDR from BD_ADDR list box. 7. Enter the remote Serial Port Server RFCOMM Port in the text box at the bottom of the screen. 8. Click “Open CLI” button. 9. If the connection is successful, then SPP open Port Confirmation, with status 0x0000 message will be displayed.