How do I force the reports to show values and calculate loses for non-economical graphs?
Go to Editor | Cases, choose the case you want, and click the Expense Tab. At the bottom left hand corner of that window, click on the ECL After&ldots; button and a window titled ”Calculate Economic Limit After &ldots;” pops up. The users can then either: 1) Change the linked date to EndPrj from the drop down menu. OR 2) Click the User specified radio button and change the date to however far you want to see into the future. Note: The user can see more specific values by going into forecast mode (i.e. open the ARPs window), click on the walking fingers symbol and walk down to the specific day you want (or just enter it in at the top). Then go to Reports | Case Error Check (shortcut: Ctrl E), and all the values for that day will be shown in the window.