How do I determine what ight side and left side mean with sectional pieces?
Related Questions
- Also, regarding the rock rubble requirement, does that mean that I shouldn include larger pieces of live rock, or just that I need to make sure that I have enough rubble to keep them happy?
- The remaining 25% is due prior to shipment of the pieces. Q: How can I determine what I would pay for a certain design?
- How do I determine what ight side and left side mean with sectional pieces?