How do I construct a proper working cover outdoor in the marina/yard over the working area?
Sailboats – use the mast, poles, rope and empty containers filled with water. If you work in a cold period around +5 to 10°C, one or two big heaters (no fan) can increase the working temperature under the cover and speed up the drying time. Powerboats – Use the fly-bridge or the navigation mast to construct a similar structure above.
Related Questions
- If doing an outdoor project and rain is forecasted, can I cover the area with plastic to protect the grout from rain? During wet conditions will the drying period be extended?
- I play outdoor cricket, where we have to cover a lot more area. Indoor cricket can’t be that much of a workout?
- How do I construct a proper working cover outdoor in the marina/yard over the working area?