How do I allow reconfigure to identify a baseline project?
Reconfigure templates without a baseline will produce the following warning when a reconfigure is performed: WARNING: Could not identify baseline project for ‘projname’ matching baseline selection criteria of reconfigure template. This warning appears to have been introduced with CMS6.3SP4 – prior to SP4, no warning was displayed when the reconfigure template did not have a baseline specified. The solution to the problem is to specify a baseline for the reconfigure template. Check the project’s history to see if a baseline project exists someplace earlier in the project’s lineage: