How do carriers determine the location of a new cell site?
• Once they determine that a new cell site is needed in a specific area to provide reliable coverage and handle call volume, a technical team visits the area to identify possible locations. Potential sites are evaluated from several perspectives: -Technical analysis: Engineers identify which location offers the best technical solution to address coverage gaps and service needs. -Zoning and permitting: Zoning specialists ensure that all local zoning, permitting, and building codes, plus all state and federal regulations, can be met at a location. -Real estate: Site acquisition specialists look for viable leasing arrangements, such as an amenable landlord and round-the-clock site access for technicians. -Construction: Construction managers ensure that the proposed site can be constructed safely and will meet all municipal building codes and safety standards. Once the location that best meets all the above criteria is selected, the carrier works with local officials to obtain all required