How disruptive will the installation process be?
UPL personnel and contractors work very hard to keep surface damage and other disruptions to a minimum. Whenever possible, UPL bores beneath roadways to minimize or eliminate the disruption of transportation. Similarly, horizontal boring along easements keeps surface damage to a minimum. By installing lines along the outer edge of easements, damage to individual properties is kept to a minimum. As the distribution lines are installed, professional restoration crews restore the surface and areas affected by the pipeline.